MEC was invited to assist with design work for the earthworks associated with the Nicaragua Canal Project. The project required excavation of approximately 4 billion cubic meters of material. MEC was approached to provide a plan that would optimise the earthworks component of the job. The advice from MEC cut through typical construction jargon, enabling the client to optimise their investment in engineering construction, management and machinery.