PROJECT:   Peak Downs

  • Medium term planning and design for several pits
  • Strategy design for winchester fault crossing
  • Onsite design for dragline and truck shovel strips in the 2 year plan

PROJECT DETIALS:

LOCATION:

Australia

CLIENT:

BMA

COMMODITY:

coal

OPEN CUT / UNDERGROUND:

Open Cut

SERVICES:

dragline engineering, medium term planning, onsite engineering, truck shovel engineering

DURATION:

2007 | 2008 | 2009 | 2012 | 2013

◀ Back to Projects