PROJECT:   Hail Creek

  • Ramp 6 Boxcut design and planning, dragline sequence and spoil balancing
  • Generate final landform quantities from life of mine dump profile
  • Design and volumetric evaluation of coal stockpiles for the product optimisation project
  • Build of the Xact short term schedule model

PROJECT DETIALS:

LOCATION:

Australia

CLIENT:

Rio Tinto

COMMODITY:

coal

OPEN CUT / UNDERGROUND:

Open Cut

SERVICES:

3d dig, coal quality, dragline engineering, dump design, medium term planning, rehabilitation and landform, training

DURATION:

2008 | 2011 | 2013

◀ Back to Projects