PROJECT:   Coppabella

  • Johnstone pit mining and strategy
  • Dragline strategy advisory
  • Medium term prestrip design for 5 year plan
  • Site role underatking the senior engineer role including scheduling,dragline and TS strategy
  • Upgrades to the Xpac schedule model including introducing solids for visualisation
  • Onsite role completing truck shovel planning and design

PROJECT DETIALS:

LOCATION:

Australia

CLIENT:

Peabody

COMMODITY:

coal

OPEN CUT / UNDERGROUND:

Open Cut

SERVICES:

dragline engineering, drill and blast, medium term planning, onsite engineering, reserving, truck shovel engineering, xpac model build

DURATION:

2012 | 2013 | 2014