PROJECT:   Bluff

  • LG optimisation of the pit
  • Re-modelling of the resource, producing several iterations as new drilling was completed
  • Published the JORC resources report for several resource iterations
  • Published the JORC reserves report over several resource iterations
  • Pit design, haulage calculations, dump planning
  • Development of mine plans for the project feasibility study
  • Stripping strategy, concept development, dragline and dozer push sectional analysis and reserving

PROJECT DETIALS:

LOCATION:

Australia

CLIENT:

Carabella

COMMODITY:

coal

OPEN CUT / UNDERGROUND:

Open Cut

SERVICES:

deswik model build, feasibility study, geological modelling, haulage planning, jorc reporting, lerchs grossman optimisation, long term planning, medium term planning, reserving

DURATION:

2013 | 2014