PROJECT:   Bengalla

  • 3D Dig simulation of dragline operations for the production expansion, revision of the dragline method to achieve production increases
  • Generation of dragline prime factors for the life of mine plan

PROJECT DETIALS:

LOCATION:

Australia

CLIENT:

Coal and Allied

COMMODITY:

coal

OPEN CUT / UNDERGROUND:

Open Cut

SERVICES:

3d dig, dragline engineering, dragsim model build, long term planning, medium term planning

DURATION:

2012 | 2013 | 2014

◀ Back to Projects